Font Size: a A A

Large Storage Tank Hydraulic Flip Construction Project Management

Posted on:2011-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y F YangFull Text:PDF
GTID:2192330338984176Subject:Project management
Abstract/Summary:PDF Full Text Request
The Pot is almost used in the industry of Chemical,Petroleum,Pesticide,Logistics and so on.In recent years,Because of the Equal volume premise of the large slot and pot, it has advantages as follows,it covers an less area and low investment costs.With the development of the Social Science And Technology,The slot and pot is growing trend to large-scale.AS the construction enterprises,for the manufacture and installation of non-standard parts,throughing R&D and creating the advanced construction technology and engineering methods,Reduce the construction cost,Shorten the construction period,which will occupy the opportunities in the bidding and tender.The business of the large slot's manufacturing and installation is very competitive,It mainly reflected in the quality,costs and services.My company as a subsidiary of the China Metallurgical Group,from the founding and production of BAOGANG Steal on Sep. 1985,We'll been responsible for equipment maintenance of the major regional in BAOGANG Steal,Production cooperation and building special Engineering Machinery Metallurgy and so on.With the development of the world Five Hundred Companies,and the most modernization iron and steal leading enterprises—BAOGANG Steal,The company accumulated experience of a set of morden seal service company.Own the special technology of leading level at home and abroad.With a wide range of the various types of equipment,facilities and instrumentation.The overall strength is a leading position in the same industry.We have accumulated a set of experience of Construction Technology.Tank construction is currently being installed in the main method,In Market, especially in the petrochemical industry, construction units for the production of a large storage tank installation has begun to use the flip method,It occupy a certain cost advantage. Determines the status of the market in terms of our company product quality, cost control and upper part of the construction period are bound to face greater challenges.This article are compare with the theory of project management. It related to the use of project management knowledge. To present the construction of large storage tanks manufacture and installation of improved technology and methods to do a systematic study and proposed countermeasures. It Shorten the construction cycle and environmental objectives to improve field operations as a basis for judging project success.First,the articles start to establish research , To establish the Organizational structure project to build the project team.Use the Knowledge of project management. And With the actual situation of the construction site, Through the project safety management, quality management, cost management, time management, a detailed analysis of several aspects. To overcome the problems that Flip Chip in the implementation process. Optimization project construction organization, cost savings, and create maximum benefits for the project.
Keywords/Search Tags:Flip Chip, Hydraulic, Tank, Project Management
PDF Full Text Request
Related items