Font Size: a A A

A New Generation Of Wastewater Treatment : ARES Solution

Posted on:2016-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:B M RenFull Text:PDF
GTID:2191330476951226Subject:Municipal engineering
Abstract/Summary:PDF Full Text Request
Since 1978’s reform and opening up, our national economy and the society has achieved leap-forward development.We always blindly pursuing GDP growth,however, inevitably brought great damage to the water environment.With the annual amount of the nation’s rising, the national new emission standards issued in a row, the traditional sewage treatment plant are faced with the upgrade project, however the traditional activated sludge process has been applied to the extreme countries around the world, we need to carry on the innovation and improvement.In this paper, on the basis of a lot of reading literature, condition made a brief introduction to water pollution in China, summarizes our country town sewage treatment plant, sewage treatment technology development to the world were summarized.Systematically discusses a kind of new sewage treatment technology can ARES ecological sewage treatment system, the ARES can ecological wastewater treatment technology with the traditional A2 / O process in sewage treatment technology, oxidation ditch technology are compared, and the process and use the ARES ecological system design modification lantian county sewage treatment plant, with detailed data analysis of the ARES craft advantage compared with the traditional sewage treatment method.Finally to ARES in the successful application of shandong jining sewage treatment plant for the engineering example, calculated the ARES system compared with other economic benefit of sewage treatment technology.By comparing the calculation study: ARES compared to traditional wastewater treatment system of wastewater treatment process can be achieved: payback period is short, factory have no smell;The total annual mud reduce more than 50%;Significantly reduce the power consumption load, o-phenylenediamine and artificial cost is reduced, significantly lower operating costs, and reduce direct operating costs by more than 30%;Intermediate tank and reduce the original process including disable filter cloth filter load, such as overall save a third process area and volume;Water index is better than that of national level A, discharge standards.Treated water has been achieved in part to the paid recycling of industrial water supply.Is indeed has obvious advantages of great potential for development of a new generation of new technology of sewage treatment.
Keywords/Search Tags:New wastewater treatment, activated sludge, ARES, PSB
PDF Full Text Request
Related items