The Application Of Bill Of Quantity Bidding In Daqing Oilfield Gas Gathering Pipeline Renovation Project

Posted on:2011-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:S M WangFull Text:PDF
GTID:2189360305956970Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of market economy in our country, how to proceed the engineering cost management effectively has been an important project that architecture industry is discussing. From the rule of the Value, we conclude that construction project, as a special merchandise, it's price is related to the Rule of the Value and the relation of supply and need. As a rule, the engineering cost management must reference the market economy's characteristics as well. Particularly after joining into the WTO, engineering cost management in our country faces the problem of how to adapt to the international customary practice. In order to meet the requirement of market economy and WTO, the related department of our country has published the Code of related with bill quantity of construction works, and has put forward the Bill of Quantity Model in July 2003. Based on the information above, we put forward the study of the Bill of Quantity Model theory and its application in this article.Tender of construction works is a kind of scientific and reasonable way of contracting system, it can introduce competitive mechanism into the field of engineering construction, and guides enterprise to improve manage standards and general strength. It has been the main way of transaction in construction before twenty years ago. The old engineering cost system can not suit the need of market economy development along with socialism market economy system and reform. Our government has published the code of related with bill quantity of construction works as the national standards in July 2003, and it imports the Bill of Quantity Model into the domestic market. It provides a common starting point and environment for bidding, forms the construction cost management system with the government macro-control, the enterprise independent quotation, the market prices. The Bill of Quantity Model embodies the equity, justice, disclosure, and impels domestic enterprise to follow the international practice.With the implement of the law of people's republic china on bid invitation and bidding, invitation of tender has been accepted by all sectors of the community, the mentality of the tender according to law has been enhanced, the bidding behavior has been standardized. In recent years, the management of the domestic market has been standardized. The law system of tender is being established and consummated. Our central government and local government also published many assorted laws, to concise the Bill of Quantity Model. It means that the bidding documents must provides the work amount and measure table, the tender provides he quotation based on the engineering project, the market, the risk, the general strength. the code of related with bill quantity of construction works has the uniform pricing method, measurement rules, assignment rules, to accomplish the formal pricing.The Bill of Quantity Model is still in the planning stage in Daqing oil field, a lot foundation work needs enhancing, associated environment needs consummating. This article analyses and discusses the Bill of Quantity Model on Daqing oilfield gas gathering pipeline renovation project. There are the problem on the Bill of Quantity, unbalanced bid, norms of building construction enterprises and reasonable low-cost. The reason for the Bill of Quantity are the quality of design, the bug of the code of related with bill quantity of construction works, organize personnel, The other Bill of Quantity. The unbalanced bid problem is on the law of time and work capacity. norms of building construction enterprises problem is the enterprise has no their own norms of building construction. The reasonable low-cost problem are evaluation criteria, illegal subcontracting, claim for compensation. With all problems above, this article gives the Solution countermeasure. For the Bill of Quantity, we should improve the quality of design and the ability of organize personnel, the principle of the code setting, and the other Bill of Quantity. For The unbalanced bid problem, we should do the preparatory work well, set the highest bid, select the best method of bidding, improve the Bill of Quantity. For norms of building construction enterprises problem, we should obey the setting principle, arrange the engineering data, and dynamic administration. For the reasonable low-cost problem, we should adopt the market entry certification system, train the high level assessor, and keep away the claim for compensation.Generally, this article analyses the problem of the tendering, looks back the history of the Bill of Quantity Model, and it also shows the principle and advantage of the Bill of Quantity Model, contrasts with the traditional pricing method at last. This article explores the practice if the Bill of Quantity Model, shows the tender procedure, base price limit on bids, the Bill of Quantity of construction works, the stress of quotation and the evaluation method. After analyses and summarize deeply, this article proves the feasibility, necessity and the far-reaching of the Bill of Quantity Model.
Keywords/Search Tags:Bill of Quantity, Bidding, Daqing oilfield, Application
PDF Full Text Request
Related items