Font Size: a A A

The Construction Logistics Management's Research Of Highway Construction Enterprises

Posted on:2009-08-14Degree:MasterType:Thesis
Country:ChinaCandidate:J F ZhaoFull Text:PDF
GTID:2189360278451543Subject:Safety Technology and Engineering
Abstract/Summary:PDF Full Text Request
Since the 1990s, China's highway construction has entered a stage of rapid development, it can bring huge economic benefits for our country's reform and unprecedented development opportunities for highway construction businesses; while we see all advantages, we must be aware of: Since China have accessioned to the WTO, the majority highway construction business of China, faced with global competition and challenge in the market-oriented reform, the enterprise not only needs to maintain the best operation condition attracts the new customer, but also to increase market share in the same time by reducing costs, many enterprises need to raise the benefit through improving the management, under this condition of project quality and the time invariable, how to save the expense becoming urgently question of the highway construction enterprise.Regarding of the highway construction enterprise, use the science management to be called the optimal path.The construction logistics management is the Cross-Application of construction organization and logistics management. Its aim is completing the construction work in the appropriate time, the correct position, by the inexpensive cost and the high quality by organizing and directing work.The article unified the partnering pattern,competing ideas,JIT logistics concept and superior combination method,construction network and so on, manages to the road surface construction's following link, realized the aim of highway construction enterprise to enhances the market competitiveness under existing condition.(1) Learn partnering pattern, to improve the supply chain model in construction original, and establish new construction supply chain model that based on the partnering pattern,its aim is improving the relationship of the owner,the design business and contractor's, enables each participation side of the project can achieve the goal of common profit.(2) To perfect the single network and establish new time network planning to control construction progress; Under limited resources condition as far as possible to shorten the construction period.(3) To combine JIT logistics idea and the construction progress,work out detail scheme to control personnel, machinery, material management; Under limited resources condition, reduces the personnel,the material,machinery's use and the management fee.(4) At the construction site management, using most superior position designation law to lay out construction plane; Introduce "7s" to control the waste phenomenon of the construction site,construct green environment and so on, so that participarts to acheieve the common object.
Keywords/Search Tags:Construction Organization, Modern Logistics, Construction Logistics Management, Highway Project, Cost Management
PDF Full Text Request
Related items