Font Size: a A A

The Experiment Research On Finance Evaluation Of Power Plants Construction Project

Posted on:2009-05-11Degree:MasterType:Thesis
Country:ChinaCandidate:L P ZhangFull Text:PDF
GTID:2189360275984732Subject:Project management
Abstract/Summary:PDF Full Text Request
In this paper, a thermo generation construction project performance evaluation system has reconstructed based on the well known research achievements and following certain index devising principles, and regarding the characteristics of thermo power generation project and fully considering their economical profits and social profits.The performance evaluation system,which is constructed in this paper,has adopted Delphi Method and AHP Method to decide the weight of each index in order to avoid the deficiencies of single subjective scoring method and decide the importance of each index objectively. By dozens of investigations, a constructing project was choused and scientific and dependable data has gained to conduct experiment analysis. The outcome of final evaluation value is elaborated by used of Fuzzy Evaluation method step by step. In the process of the analysis, the detail ways is introduced. In fact, this method is easy to do and simple to be applied to practice.
Keywords/Search Tags:Power construction project, Finance evaluation, Entropy, Fuzzy matter-element
PDF Full Text Request
Related items