Font Size: a A A

Application Of Project Management In ZiJing Company

Posted on:2009-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y LiFull Text:PDF
GTID:2189360242982500Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Does the project management method obtain the widespread application as the management idea, whether the project management applies in the STN-LCD manufacturing firm amethyst company, enhances the amethyst company to have custom-made the product the management level. This article author unified in the amethyst company employment history has carried on the analysis to the company tradition mode of administration, the union project and the project management characteristic, had custom-made the product manufacture according to amethyst company STN-LCD the characteristic, the customer to has custom-made the product the date of delivery, the product performance, the quality specification to have the distinctive quality, the product production has disposable, proposed that had custom-made the product project management, proposed the project management method. Take the amethyst company STN4122 product as the example, the real diagnosis project management in the amethyst company product manufacture management application, and has appraised the effect. The project management achieved has had custom-made the product to the amethyst company the cost, the quality, the progress integrated management, realized in the management to have custom-made the product for the goal guidance management. The author proposed the project management finally, in the company has custom-made in the product management implementation the strategy.The amethyst company putting up a factory initial period uses the traditional function management, depending on specialized division Functional departments along with market change, material fluctuation, customer to request and so on quality, cost and date of delivery differences, function management, in the amethyst company produces has custom-made in the product management to have the question: To entire has not had custom-made the product responsible person directly; The various Functional departments concrete goal, has not carried on with difficulty has custom-made the product the cost, the quality, the progress integrated management; The staff function is numerous and disorderly, information communication channel sole narrow; Between Functional departments conflict and the competition hindered the order form overall goal, department protectionism to embark the consideration question from the respective benefit, emphasized partial, caused the overall situation production efficiency to be low, the quality was unstable; Various Functional departments completes the situation to the duty and the activity to carry on the effective engagement appraisal with difficulty; Coordinated difficulty. This article unifies the project the characteristic and the project management merit, has custom-made the product manufacture according to amethyst company STN-LCD the characteristic, each customer to has custom-made the product the date of delivery, the product performance, the quality requirement to have the distinctive quality, the product production has disposable, proposed the amethyst company has custom-made the product project management. Proposed the project management realizes the method, lists in the company the project management and the traditional management comparison. Take the amethyst company STN4122 product as the example, the real diagnosis project management, in the amethyst company had custom-made in the product manufacture the management application, the real diagnosis project management solution tradition management in the amethyst company has had custom-made the question which in the product manufacture management appeared. Analyzed the project management to have custom-made the product project in STN-LCD to induct the stage, the planning stage, the control stage, the project implementation application, and the application result made the appraisal to the project management in the company STN4122 product project. Finally has given the implementation improvement strategy to the STN4122 product project management implementation's question.This article STN4122 product project's supervisory work has carried on real diagnosis from below various aspectsInducts the stage in the product, carries on the SWOT analysis to the company STN4122 product project's initiating a project environment, has analyzed the profession condition which and the present market condition the amethyst company STN-LCD market's localization, the company locate. Analyzed the amethyst company to have the scale to be big, the technology was strong, equipment excellent superiority. The company produces at present can the utilization of capacity be insufficient, the excess capacity of production, the small and medium-sized enterprise reduces the quality to hit the price war, the amethyst company abandons the inferiority development superiority. The amethyst company inducts the stage in the STN4122 product project to carry on the risk control, involves department's opinion, the information, the data take the project department as the central collection project to make the appraisal, works out the contract, has formulated the corresponding datum in the contract for the next step project plan, is the cost control agent, the quality control standard datum and the bilateral responsibility limits, quantifying, the qualitative limits, controlled the project to induct the risk which the stage could control, carried on for the project has made the safeguard.The product project plan stage has made the STN4122 product project management work plan, involves the scope department to the STN4122 product project plan to draw up the standard, to plan and to analyze appraises its plan to the STN4122 product project quantitative, and role which can play to the STN4122 product project goal, pointed out that in the STN4122 product project various numerators goal plan is aims at project goal the concrete step and the measure. Involves mixes, the plan to the STN4122 product project various sub-items group's resources. Design department to STN4122 product project plan; The tube department to the STN4122 product project's quality plan, involves the child to plan, the STN4122 product project's product, the procedure, integrates the controllable scope; Storage and transport department existing resources and physical distribution resources dynamic monitoring and so on; In the STN4122 product project plans, the personnel, the system, the responsibility, the monitor area formulation and the correlation project group's preparation, the rear service to the STN4122 product project safeguard; The manufacture department took the STN4122 product project the sub-item group the refinement project group, completed to the STN4122 product project goal carries on the personnel to organize to plan, to equipment's plan, corresponded the STN4122 product the craft, the operating condition document to carry on the preparation.Product project control stage in view of STN4122 product project control characteristic: The STN4122 product's quality control had decided the cost control, the STN4122 product's quality control can also guarantee the product project progress, carries on the strict quality control to the STN4122 product project. From the quality control scope, the quality specification, the appraisal supplier, the monitoring material, the start quality testing procedure, fifty-fifty the end product uses the hierarchical control, the amethyst company to the STN4122 product project in quality management point establishment, in the control point the quality qualified rate's decomposition, the quality control information data processing, the statistical analysis, the feedback, the improvement, forms the seal quality improvement circulation, the quality control uses the diagram method, the causes and effects analytic method, the tool examination, equipment's measuring appliance parameter record; The quality document compiles method. Uses the reliable experiment to the end product performance's control, makes the corresponding STN4122 product performance experiment. The control uses the environment reflector test to the environment, the data recording makes the control chart, implements the entire journey to the STN4122 product to be controlled, the whole staff participates, the joint administration quality policy.The product project implementation stage has carried on the concrete execution based on the project implementation's theory, simultaneously carries on the analysis to the STN4122 product project's implementation, the STN4122 product project implementation by the project plan program file, the standard, the corresponding execution, related sub-item group coordinated advancement. Between STN4122 product project parallel communication, high and low communication. The STN4122 product project group advances the STN4122 product project together take the goal as the guidance.Finally has appraised the STN4122 product project result, in the project management result and the execution question. Proposed in the project management implementation improves the strategy, strengthens the aspect in the implementation.This article elaborated uses the correlation method, the diagram method, the illustration law to draw the conclusion, the project management method utilization, in the amethyst company had custom-made in the product management work to achieve has had custom-made the product to the company the cost, the quality, the progress integrated management, realized in the management take to have custom-made the product as the goal guidance management. Must pay attention to the implementation strategy in the implementation, the establishment strengthens the project team to construct, the establishment enterprise culture, the establishment incentive mechanism, to strengthen the communication. This article has custom-made the product manufacturing enterprise management and operation primarily to the STN-LCD profession to have certain reference significance.
Keywords/Search Tags:Application
PDF Full Text Request
Related items