The Risk Management Of Gomal Zam Dam Multipurpose Project

Posted on:2007-07-15Degree:MasterType:Thesis
Country:ChinaCandidate:D SiFull Text:PDF
GTID:2189360212458900Subject:Project management
Abstract/Summary:PDF Full Text Request
The characteristics of large-scale international project are huge investment, long construction periods and complex construction. It is very difficult to control the risk of project, the contractor will meet with the challenge of all kinds of risks due to the risk contained in the project is complex and changeable. The economy of China at present is developing in very high speed and economic internationalization is unavoidable, the internationalization management of project for contractor is inevitable. Opportunity and challenge is coexistence, it is very important that the forecasting for international investment and management during ungovernable international business competition. How to understand control the risk of international project in effect is the key point of international project management and obtaining economic profits and which can influence the international strategy of contractor. Moreover, a great deal of uncertain ingredient was involved during the construction of large scale hydropower projects, so the risks are up against more and more. And the internal relationship between these risks ingredients is very complex, the multilayer characteristic of risk will be displayed due to the cross influence between these risk ingredients and outside ingredients. Gomal Zam project is a large-scale hydropower international project, because of the complex background and special contract condition, there exist so many risk ingredients, so it is a representative case in the aspect of international hydropower risk management. The risk characteristics of this project are as follow:1.Diversity: Gomal Zam project must face to the overall process risk of...
Keywords/Search Tags:Multipurpose
PDF Full Text Request
Related items