Font Size: a A A

Cost Control Over Power Transmission Sequence SBD Enterprise

Posted on:2012-02-18Degree:MasterType:Thesis
Country:ChinaCandidate:W DingFull Text:PDF
GTID:2189330335454179Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Project cost management and control is any enterprise unit project management important core. In the increasingly fierce market highly competitive environment, project cost management and cost control is not only related to the existence and development of labor enterprise, but also become reform enterprise construction project management, perfect the enterprise mechanism innovation of the key. So for the project cost control research to improve the enterprise core competitive power, perfect enterprise management system, and has important theoretical and practical significance.In grid lines, implementation of systematic construction project cost control, can effectively control enterprise construction cost, improve enterprise net profit. But, compared with European countries SBD company countries in the construction of power lines of cost management control research results is still at the primary stage, in project cost control theory framework and research with practice, cost control innovation system and method also slightly deficient. So, in grid construction project cost management and control science rationalization, is more urgent.This paper is divided into five parts. The first part from, and puts forward to choose a background of paper to research the problem and research significance, then in combination with the domestic and foreign research results are put forward on the basis of this paper writing ideas and research methods. The second part of the company SBD analysis, proposed SBD company grid construction cost management problems. The third part of SBD company projects through before after process project cost control in concrete proceedings do detailed analysis SBD company program for solving actual problems existing in the provide theoretical basis. The fourth part in grid construction widely used in the industries of cost control methods are put forward on the basis of SBD grid lines for the construction cost control of the existent problems and puts forward some effective methods and countermeasures for SBD company cost management, put forward the effective ways and Suggestions. The fifth part of SBD company grid lines by two of the actual project before and after rectification of the cost and profit case analysis verified according to the company, the problems existing in the project control proposed to improve the efficiency of the method.
Keywords/Search Tags:grid lines construction, Cost management and control, The countermeasure analysis, Case studies
PDF Full Text Request
Related items