Font Size: a A A

Research On Optimization Of Sewage Treatment Process Of COFCO Zhaodong Company

Posted on:2016-06-26Degree:MasterType:Thesis
Country:ChinaCandidate:M LinFull Text:PDF
GTID:2181330467498048Subject:Operational management
Abstract/Summary:PDF Full Text Request
COFCO Zhaodong company under the COFCO group, as the central enterprises,should be one’s unshirkable responsibility to do a good job of environmentalprotection work in the production practice, implement the basic national policy, tosolve the problems of sustainable, rapid, healthy development.COFCO Zhaodong company products in the current annual output of400000tons of PEW super ethanol,330000tons of high protein feed,30000tons of crudecorn oil,15000tons of food grade carbon dioxide. A large number of products outputneeds to consume a large amount of a water, circulating water, desalted water, andsewage generated increased rapidly with the increase in production capacity and. Atpresent, the sewage according to the concentration of distinguish one class of lowconcentration of inorganic waste water, and plant life sewage together by themunicipal drainage net emissions; another is the high concentration organicwastewater, the oxidation pond treatment after discharge. The company in order toreduce the total amount of pollutant emissions, save water resources, complete thequota of total control task, decided to carry out the process optimization schemeoptimization study on wastewater treatment.Study on Optimization of content of COFCO Zhaodong company sewagetreatment process is divided into four parts. First introduced the research background,significance of optimization of process flow and the content and method of treatmentof sewage.Secondly, for COFCO Zhaodong company sewage treatment process status andproblems of analysis. In the collection, analysis the development process of basic sewage treatment technology trend at home and abroad, analysis and comparison ofthe technology, and in the light of COFCO Zhaodong company in the sewagetreatment process the existence of backward technology, can not keep up with therapid expansion of the scale of water sewage treatment capacity of pipeline,demonstration, sludge treatment facilities construction the serious lag etc.. R&Dmembers deeper sewage process field, find the existing problems in process andanalysis.Thirdly, this paper discussed at the same time of COFCO Zhaodong companysewage treatment process optimization scheme, but also on the process optimizationprinciple and target program analysis of sewage treatment, the process designscheme is discussed. Combined with the actual production situation of personnel oftechnology of company, of the process are compared and analyzed argument. Thistext a pragmatic and efficient principles, in the company of human, material andfinancial resources, permitting, in the scheme selection, give optimized scheme andimplementation.Finally, puts forward the safeguard measures of the optimization scheme ofsewage treatment process. In the establishment of the system, perfect to improveproject management personnel quality, strengthen financial management and costmanagement, the introduction of incentive mechanism in four aspects, after thecomprehensive analysis of interpretation, and technical personnel to choose from thestart, sewage treatment process configuration of personnel and management toenhance this several aspects, carries on the comprehensive optimization of theprocess the process of sewage treatment, finally realize the stable operation ofsewage treatment process. Process optimization scheme of efficient continuous,stable operation, will solve the problem for enterprise environmental treatment formany years. COFCO Zhaodong company also fulfilled the social responsibility ofthe enterprise, and make due contributions to the construction of harmonious society.
Keywords/Search Tags:wastewater treatment, process scheme, anaerobic technology
PDF Full Text Request
Related items