Font Size: a A A

Demonstration Of LNG Storage Area Epeirogenic Project In Tianjin Nanjiang Southern

Posted on:2014-04-16Degree:MasterType:Thesis
Country:ChinaCandidate:D MiaoFull Text:PDF
GTID:2180330422468966Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
with China’s economic northward In recent years, as the Bohai Economic Zonenatural center and a major foreign exchange window, Tianjin Binhai New Area’seconomy has been developing rapidly. With the deepening of regional developmentand opening up, shortage of land resources has become increasingly prominentfeatures, has been a key factor restricted the further rapid development of the region.Binhai New Area in recent years, land reclamation projects ongoing, as of2013,Reclamation land area of a total of nearly250square kilometers. Accompanied by theregion’s economy sustained, steady and rapid development of natural gas thishigh-quality, efficient, and clean energy demand soars, domestic supply can not meetdemand, the urgent need to introduce supplementary.2013natural gas consumption isexpected to notch Binhai New1.5billion m3. The project that carried out toconstructing is in the above two context. This species from the project cargotransportation means of transport, planning, siting and marine utilization and othermulti-angle analysis of the project with the sea is adapted to regional developmentand industrial layout is critical for achieving goals southern port control planningneeds, is to meet the Tianjin sustainability and resource space to expand demand theinevitable choice.Practice shows that the scientific and rational argument for regulating marinedevelopment and management order is significant. Reclamation land engineeringdemonstration should include project with the sea base, the project where the watersbefore analysis, project the use of sea resources, environmental impact analysis,marine exploitation coordinated analysis project with the sea and marine functionzoning and related planning compliance analysis, project with sea rational analysis,countermeasures sea use management and other aspects, combined with theprofessional features, this paper mainly discussed in the following aspects:(1) demonstrate the content, level and basis;(2) the basic situation of the project with the sea, the need for project constructionand use of the sea;(3) the natural environment,natural resources and development Status of thewaters where the projects is; (4) project with the sea environment, ecology environmental impacts and risks;(5) the characteristics and risk analysis for the project and makerecommendations.Through the analysis of the above aspects, hope to provide a useful reference forthe future land reclamation project feasibility studies.
Keywords/Search Tags:Oceanographic, beach, shoreline changes, sediment movement, theecological environment
PDF Full Text Request
Related items