Font Size: a A A

The Engineering Item Construction Quantity System Building And Its Application Study

Posted on:2005-06-29Degree:MasterType:Thesis
Country:ChinaCandidate:W D HanFull Text:PDF
GTID:2179360182475739Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
With reform and opening up, architecture industry, as an exhibition stage ofnational economy and science, has witnessed the outstanding success in china whenexperiencing the booming development of technology and economy. Nowadays,construction quality administration and quality control process have changed greatlydue to the emerging of the new materials, technology, and process. And the issue ofconstruction quality has been brought to public attention since the exposure ofserious accidents occurred in many construction projects. Obviously, the problem ofengineering-oriented quality not only do great with both the whole nation and eachindividual but a vital ingredient of weather a enterprise can maintain the successamong the fierce competition in 21th century.To this end, upon making an analysis of product properties and qualityadministration processes,the author, resorting to a real construction of a integrativebuilding in shandong's some develop zone, establishes construction quality controland administration system and quality guarantee system which are on the bases ofgeneral quality administration and ISO9000: 2000 administration standards seriesand frames procedures for quality control as well as examination on the building;the author, according to the function of quality administration, discusses the qualitycontrol on the important elements such as individuals, materials, processes, etc.which are some of the five influencing elements:individuals, materials, machines,techniques and environments;and the author also makes an cause-effect analysis ofinfluencing elements in construct quality of armored concrete grouting stake as wellas the quality administration and pre-control the construct process of prouting stakein order to clarify the conditions of construct process control. The author also utilizesstatistics to realize the effective quality control on the successful construct of thebuilding by pre-controlling forming process of the concrete in bottom-flat groutingand pre-controlling the hardness of concrete in constructing prouting stake.In thethesis, the construct quality is synthetically evaluated by using customers assessingmodel and the satisfactory result is obtained from the analysis of it. The authorargues that construct quality control should be shifted from adopting the method ofconstruct process control and quality examination to persisting focus oncustomer-oriented strategy to enhance the quality.
Keywords/Search Tags:Construction Quantity, Quantity System, Quantity control, Customer Satisfaction Measures, Evaluation
PDF Full Text Request
Related items