Font Size: a A A

Research And Application Of Management Information System Applied To Work Planning In The Workshop Of Gear Factory

Posted on:2007-03-22Degree:MasterType:Thesis
Country:ChinaCandidate:H B YangFull Text:PDF
GTID:2178360212458920Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the development of intensifying market competition and globalization, the manufacturing technology has become a decisive factor not only in the market competition but also in the battle field. As a result, it has become one of the crucial indicators in a country's capability when measuring its science and technological level. To meet the rapid development of machinery manufacturing technology, I have took lots of measures, such as implementing advanced quality assurance system, optimizing automobile gearbox, and expanding cooperation constantly, all of these required a new technological, qualitative, and managerial standard to the parts production and processing procedure. While in the mean time, our managerial modes, methods and measures can hardly meet the new standards. Given the enormous number of parts, tools, and so many items, it is a very difficult problem to the fundamental management and production control in the workshop.Under this background, the paper makes a deep analysis to the existing production management of the Gear Parts sub-company of FAW,being it's managerial mode still in the planning marketing one, its main production schedule, distributing production schedule monthly, so, the workshop assigns it's execute schedule according to the main production schedule, arrangement, organization, and produce in the assemble line, until deliver the final product . The paper also analysis the problem existed in the mode: the fundamental work of planning and management is not very well, the balance of planning is very rough, the arbitrary of working schedule, the feedback information of production schedule is unclear and slow, the corporation of different department cannot work well in time, the management of tools and planning are not in accord, etc.. all the problems discussed restrain the Gear Parts sub-company of FAW and constitute a barrier, especially during the"the fifteenth five-year-planning",the most busy period will come and it is critical of advancing the level of management efficiently,...
Keywords/Search Tags:Application
PDF Full Text Request
Related items