| The foundation of process industry of our country is weak, WTO has put forward higher demand for enterprises even more. Enterprises must accelerate one's own information-based process , make the key competitiveness . As the important component of the manufacturing industry, the locomotive overhauls the trade and takes the information-based road, strengthen one's own competitiveness .This article overhauls the trade characteristic to start with from the locomotive , find out 3 big problems of perplexing the trade: It is poor to overhaul quality; It is low to overhaul efficiency; It is with high costs to overhaul. If do not solve above-mentioned problems , will restrain the locomotive from overhauling the trade to develop.Function that ERP system controls the quality of production , improves production efficiency , lowers costs . But ERP system in common use is used and all ended in failure in the locomotive trade. Then, what kind of ERP system is the locomotive which is suitable for the national conditions of our country to overhaul ERP system? In order to find the answer to the question, we choose the rolling stock plant of Taiyuan as the pilot project.Proving through analysing, we have chosen two pieces of breach: 1 )Using networking picture as the basis of production monitoring, this is produced by the locomotive trade and organized the way particularity to determine. 2)Resolve supplies thread and locomotive thread is it develop to walk abreast , this to overhaul by locomotive trade particularity that supplies grant determine.At present, should run systematically in sound conditionly , the more valuable one is: It is used widely too that this system overhauls the producer in other locomotives . Therefore, this system is exactly that alocomotive overhauls ERP system that the trade needs. The article end. through feedbacking processing out the conclusion to users furtherly of information and system data, the trade ERP system should be that the locomotive of our country overhauls: l)The system will control production with the network chart. 2)The system should adopt the spare part storehouse and locomotive to resolve two threads and run side by side in the form to build up. 3. )Break the constraint of the process, pay attention to the nodal function of the network chart. |