| In the conception of management by oneself, profit and loss by oneself,the effective coalescence of Cost and quality management will produceconsiderable economic benefit. However cost and quality management has beenimperfect as for overhauling of the electric power plants. At one side of costmanagement, the decision-makers care of whether the electric power plantsoperate smoothly or not, so that the attention of the overhaul cost is not enough.At the other side of quality management, the most document levels are so muchthat it is not as our wishes for transmitting and managing withComputer-Computer. On the base of the investigation of YuanBaoShan Electric power plants, thispaper emphasizes the importance of the overhaul cost and overhaul qualitymanagement. The paper designs to make a cost scheme budget by the estimatedway from down to up, track the actual cost based on EVM(Earned ValueAnalysis) technique and analysis the future cost trend. Of course the paper alsodesigns to evaluate the sub-project and the whole project after the paper dealswith the document quality levers to measure. In a word the paper tables aneffective data reference to the decision-makers. |