Research Of The Claim Management By The Engineer Under FIDIC's Conditions Of Contract For Construction

Posted on:2004-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:H Q ZhangFull Text:PDF
GTID:2156360092485061Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
Conditions of Contract which FIDIC compiles are a kind of standard contract management method, and have been adopted by most international projects. From the point of view of the engineer, this paper discusses the meanings, characteristics types of claims, connection between claims and variations, and analyses the claim clauses in new red book (Conditions of Contract for Construction) systematically. In this paper, the role and function of the engineer in claim management is discussed. This paper also analyzed the procedure and principles in claim management and how to distinguish claim proofs. This paper also gives systematical analysis to the types of project delay and the handling principles of claims of delay and cost.Combinating engineering examples, the paper analyzes the engineer how to handle the delay for a project, accelerating construction, and unforeseen events.Zhang Hongqing (Engineering management)Directed by prof. Huang Wenjie...
Keywords/Search Tags:FIDIC, conditions of contract for construction, the engineer, claim management
PDF Full Text Request
Related items