Font Size: a A A

The Research On The Management Thought Of Project Of T. E. Mao.

Posted on:2008-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:R HouFull Text:PDF
GTID:2155360215491244Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
T. E. Mao. (1896-1989) is a well-known bridge expert, the civil engineer and the project educationalist. The remarkable management thought of project and technical of T. E. Mao. is a kind of eximious contribution which makes to the human society. It is precious wealth for posterity. It is the crystal of the management thought of project of T. E. Mao. That means the thought of harmony, thought of forecast, thought of system and thought of optimization.The thought of harmony manifests fully in that T. E. Mao. attaches importance to the harmony between the project and society, the harmony between the project and the humanities, the harmony between the project and the environment. He emphasized that the engineering construction must base on society's necessity, the feasibility of social economy as well as the efficiency of engineering project. T. E. Mao. had strong humanities spirit. He emphasized the bridge construction and people education simultaneously. He devoted to the popularization of science and wanted to construct a bridge between the science and the humanities. T. E. Mao. paid attention to the harmony between project and environment. He advocated that the expansion of project should be changed as the change of the social environment.The thought of forecast includes the foresight of engineering construction and project prospect. T. E. Mao. paid great attention to the foresight of the engineering design and the project construction as well as the preservation of engineering file. He had the accurate forecast for the future engineering. He expected the future bridge and railway from such ways, means building material, method of construction, architectural appearance and so on. Many of these forecasts have realized now or soon.The thought of system is the summation thought of holism, relativity, structure and order. T. E. Mao. expressed holism of bridge and used it to explain the problem of bridge vibration. He thought that the bridge construction involved various factors, for example, the hydrology, the landform and the weather condition and so on. So we should take thorough investigation on the factors above before the project development. T. E. Mao. reseted the organizational structure of administrative person and had his own unique opinion on the bridge structure. He arranged the order of entire process reasonably and took scientific method of construction.The thought of optimization explained that how did T. E. Mao. deploy resources. He did his best to optimize the construction troop, to distribute the bridge fund and to filter the building material scientifically. This kind of disposition had laid the foundation for the smooth construction of the Qiantang River Bridge. T. E. Mao. developed technological innovation as circumstances permit. It had provided the technical guarantee for the resources disposition and saved man-hour for the bridge construction.
Keywords/Search Tags:T.E.Mao., the Qiantang River bridge, the management thought ofproject, thought of harmony, thought of forecast, thought of system, thought of optimization
PDF Full Text Request
Related items