| Based on the deep researching of air cooled condenser performance analysis for the existing air cooled generation units, the calculation model for the operation optimization of the ACC system was put forward, thus providing conditions for the determination of the optimized operation scheme for the ACC system under different environmental conditions and operation loads.An ACC operation optimization calculation example was given for one domestic air cooled generation unit, and some of the calculation results were site tested. It was proven that the actual test results matched with the theoretical calculation results perfectly or closely. It shown that the analysis method and theoretical calculation model provided was correct, and was suitable for the analysis of the ACC operation optimization for air cooled generation units. |