Font Size: a A A

Procurement Management Of Qingzang Railway Passenger Train's Class A3 Maintenance Components

Posted on:2011-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:Q LiFull Text:PDF
GTID:2132360305961020Subject:Project management
Abstract/Summary:PDF Full Text Request
Since opening of the Qinghai-Tibet railway passenger train of Chengdu-Lhasa on July 1,2006, the accumulated running mileage had reached the A3 maintenance requirements by October 2007.The large-scale pieces overhaul of the key parts ensures the safe operation of passenger train, and implementation of high-standard maintenance on the upper part of vehicles restores the function of facilities in the upper part of the passenger train. The Qinghai-Tibet Railway train adopts the new technologies, new processes, new materials, and new devices and it is the first time A3 maintenance of the Qinghai-Tibet Railway train. The parts of high quality and timely supply are obviously important. This paper, starting from the actual operational needs, combined with advanced methods of project management, choose the best way for the Qinghai-Tibet Railway A3 maintenance components procurement from the project, planning, scheduling and resource management to project supervision and control, until the end and evaluation of projects, which should make full use of project management methods and principles. The effective management methods have completed the project with successes and ensured the first time A3 maintenance of the Qinghai-Tibet Railway train since it opened. Effective project procurement management is to ensure the successful implementation of the project. If the project procurement misconducts or mismanages or the procurement of products fail to project requirements, it will not only affect the smooth implementation of the project but reduce the anticipated benefits, and even lead to the failure of the entire project as well. Sound management of the project procurement method can reduce the project cost to avoid contract disputes, ensure the payment schedule, and prevent corruption and waste. This study will provide the future plans and theoretical guidance for the repair of Qinghai-Tibet railway passenger train. The paper major studies the following three questions:1. combine with the first time A3 maintenance of Qinghai-Tibet railway passenger train since the 1 st July,2006, to discuss the theory and practical application of the components procurement project management.2. How to use classic project procurement management methods into the practical work and solve practical problems. From the project start-up, planning, scheduling and resource management to project supervision and control until the end and evaluation of project, making full use of project procurement management methods, to ensure the continuity of the supply chain. It provides a good theoretical guidance and practical experience for the future work.3. Analyze the project, get the scientific and rational parts ordering and suppliers selection strategy, using an effective method of contract management and stock management to operate norms of suppliers'management behavior, ensure that the supply of quality components and lower procurement costs.
Keywords/Search Tags:Qinghai-Tibet railway passenger train, class A3 maintenance, project procurement management, components
PDF Full Text Request
Related items