Font Size: a A A

Optimization Study Of The Geometries Aerator For Spillway

Posted on:2010-11-23Degree:MasterType:Thesis
Country:ChinaCandidate:Y YuFull Text:PDF
GTID:2132360302960463Subject:Hydraulics and river dynamics
Abstract/Summary:PDF Full Text Request
For a long time,the cavitation phenomenon is considered being a problem hard to be solved.Cavitation and the research on it,no matter we analyse it from international or domestic,it hasbeing taken seriously attention and has a gradually thorough trend on it.Not only the academicexchange is more and more,but also there are many engineering problems on it,study content of theproblem is broadening, expanding, it has also becoming one of the problem that many relating industry pay attentions to.The domestic and international research circumstances indicate that,study on cavitation andcavitation errosion mechanism and their influencing factors have got a great progress already.Butwe must point out that,since cavitation and the cavitation errosion is a complicated phenomenonsuch as microcosmic,instant,random and heterogeneous,by now,theory and many research resultabout cavitation and cavitation errosion can not all be desired,a lot of problem remains to furtherstudy and probed in a deepgoing way.The engineering experience indicates that,aerator is an important measure to provent cavitation errosion for flood spillway,according to the research and model test taken by domestic institute on some in building or already building large-scale flood spillway, the reasonable setting of aerator can get a perfect aeration effect.At present,aeration facilities are set up to almost all the in building or already building large-scale flood discharging bulding,however,basically the practice of aerator is prior, the corresponding research and model tests of aeration facilities are relative lagging. The project of aeration facilities is commonly ensured by physical model test before put into practical engineering. But the study of air entrainment to alleriate cavitations is relatively laggaing.Based on former study of others,this paper is basically aim at the problem of cavitation and cavitation erosion and aeration facilities for proventing cavitation erosion.Associate with the project example of the flood spillway of Tian shengqiao 1 hydropower station, carried on a research mainly to the cavitation and cavitation errosion and aeration mitigation and their application in the flood spillway with high head and huge discharge.The applied shapes of the aerator's which were suitable to the project,this kind of design is convenient to project construction, ensure the construction quality,reduced the cavitation erosion and increase the safety degree of flood spillway.
Keywords/Search Tags:spillway, Cavitation and cavitation erosion, Reduction by Aeration, Model Experiment
PDF Full Text Request
Related items