Font Size: a A A

Feasibility Study Of Shi Heng Power Plant #2 Steam Turbine Flow Renovation

Posted on:2009-12-14Degree:MasterType:Thesis
Country:ChinaCandidate:M K SunFull Text:PDF
GTID:2132360275484605Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
In the survival and development process of power generation business, upgrading of equipment as the means of enterprises to expand production,improve product quality and technical content,playing an important role in remain competitive,increase the vitality of enterprises and protect the enterprise for sustainable development.At the same time,upgrading of equipment as an investment in fixed assets,for the development of society to create a continuous economic growth. Scientific feasibility study of renovation projects before investment,from the macro point of view,is an important means of nation to strengthen the effectiveness of the investment management;from the micro point of view,is the basis of investors, policy-makers to provide a scientific decision-making.As a result of the scope of the feasibility study of machinery and equipment upgrading is more general,and most of the feasibility study and related documents do not list their to set out a separate discussion,this paper attempts to start from theory and current situation of feasibility study,research and exploration an effective way to conduct a feasibility study of machinery and equipment upgrading in the power generation business.
Keywords/Search Tags:Shi Heng power plant, # 2 steam turbine, renovation and reform, methods, research
PDF Full Text Request
Related items