Font Size: a A A

Study On Funcation Of Early Alerting & Early Controling For NingBo VTS

Posted on:2010-06-29Degree:MasterType:Thesis
Country:ChinaCandidate:S Y ShiFull Text:PDF
GTID:2132360275453716Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
In this paper,according to Ningbo-Zhoushan port development and construction,it analysized terminal building,sea area traffic situation,remarkable increase of traffic flow and the complexity of the water area safety,put forward opinion that utilize NingBo VTS reasonably to reach the goal of early alerting & early control in the accident dangers.In that way,accidents in the ports could be decreased and the smooth port producing could be assured.Meanwhile,it studied the drawbacks in current NingBo VTS such as out-dated database systems,unskilled VTS staff,unscientific sea route planning,unreasonable setting of VHF channel,improper operation of inner procedures and the existence of radar blind sectors.Finally,it gave the corresponding sohitions of the problems above-mentioned.
Keywords/Search Tags:VTS, Early alerting, Early controlling, Traffic organization
PDF Full Text Request
Related items