Font Size: a A A

Analysis And Prevention Measurement Of Ferroresonance Overvoltage In 35kV Power System

Posted on:2009-08-26Degree:MasterType:Thesis
Country:ChinaCandidate:X Y LvFull Text:PDF
GTID:2132360245475434Subject:Electrical theory and new technology
Abstract/Summary:
In this paper, the model is based on Luji substation 35kV power distribution system. Simulations about ferroresonances in malfunctions of Arc earthed, single phase grounding disappear and wire-break in different capacitance current are performed with ATP-EMTP. The prevention measurements include connecting nonlinear resistance to the neutral point of three-phase PT high voltage side, connecting an arc-extinguishing winding to the neutral point of power system, connecting damping resistance to the broken delta winding of three-phase PT and so on. The simulating conclusion is that connecting nonlinear resistance to the neutral point of three-phase PT high voltage side is a good prevention measurement in there malfunctions. In little capacitance current system, nonlinear resistance is performed better than arc-extinguishing winding. In large capacitance current system, the thing is reversed.
Keywords/Search Tags:Ferroresonance, simulation study, nonlinear resistance, arc-extinguishing winding
Related items