Font Size: a A A

Construction Technology Management On City Metro Station

Posted on:2008-03-30Degree:MasterType:Thesis
Country:ChinaCandidate:J T FangFull Text:PDF
GTID:2132360242971096Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Urban metro and Rail Traffic is Chinese investment in capital construction in recent years for the hot, vigorously develop urban metro and Rail Traffic and many large cities has become the focus of municipal construction, following Beijing, Shanghai, the three major cities of Guangzhou, Shenzhen, Wuhan, Tianjin , Chongqing, Hangzhou and chendu also started the construction of the subway. Although China has been developing such as Shanghai Tunnel company several qualified construction team, most of the railway construction team has created a lot of performance in the railway, highway construction in the tunnel, but it is the lack of construction experience in urban subway construction.Basing on the Yangpu Shanghai Metro Line (on the 8th Line) technology management Construction work,this paper focuses on the city subway station underground continuous wall, SMW method, pit excavation, dewatering treatment to discuss technical details and it provides some reference materials for the city construction in the future, Thus it is important role for raising the city's subway construction technology management.
Keywords/Search Tags:Metro, underground continuous wall, SMW method, pit Excavation
PDF Full Text Request
Related items