With aggrandizement of capacity and ascent of automating the degree of modern power station machine unit, the quantity of the power station cable also increasing quickly. Lagging design and installment means of cable have become one of technique keys that hinder cable layout quality and efficiency.Make use of computer aided cable laying technique engineers can reach hint information in advance in the light of the electric cable trend, cable quantity in the characteristic section. Accordingly installing bracket and cable better, save material and increase efficiency. The system's design part can acquire connecting and actual length etc. important information of cable quickly. The system's management part can completely realizes dynamic information management for cable demanding, cable ordering, construction administration and all kinds of reports etc. in the process.
|