| During the period of shipbuilding,installation of main diesel engine and shafting is always a key project. Its quality directly influences the normal working of propulsion plant,especially,large diesel engine is easy to get some special problems in the course of installation owing to its own weight. This dissertation can be as guiding documents for actual installation by analyzing the possible problems which will occur in the course of lifting main diesel engine and shafting for 5618 TEU container,and giving demonstration and selection of lifting methods. |