Control Of Wind Farm Construction Progress

Posted on:2012-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q ZhangFull Text:PDF
GTID:2132330332997118Subject:Project management
Abstract/Summary:PDF Full Text Request
Development and use of wind power is currently the world's main energy policy, China's "Eleventh Five-Year Plan", but also the development and utilization of wind energy as an important energy policy. Wind Farm Construction in the many special factors, which make project management there is a certain particularity.First wind farm site selection special. Has the unique property of wind energy resources determines the wind farm site selection is generally resource-rich wilderness of wind, desert, hills and other highland and coastal beaches, shallow water areas. The site where the region is generally a relatively poor natural conditions, the economy is relatively backward.Electric field which together with the upper hand is not convenient general traffic areas and fan equipment "long, wide, high, overweight" four super-phenomenon, has increased the risk of wind turbine equipment transportation.Also because the rapid development of wind farm construction, construction process management is not in place.Wind power industry is an emerging technology-intensive industries, on the rich experience of technology development and projects demanding professionals. However, domestic wind power industry in the early stages of growth, lack of extensive practical experience in the technical and management personnel, in particular, the relative lack of wind power professionals, middle and senior technical staff shortage, from the current wind farm operation is not difficult to see that a lot of wind farm management is not in place. The face of the rapid development of wind power industry, wind power and the lack of qualified personnel will affect the low level of development of wind power industry is another risk factor. The particularity of the above, the wind farm project construction schedule management into wind farm construction project management is an important part of project management is also a contradiction between the work of prominent problem. Can a wind farm construction projects completed within the set time, and delivered directly related to the operational effectiveness of the investors.To ensure the construction of wind farm projects effectively, we must fully understand the impact and estimate the construction progress of various factors in order to take preventive measures in advance to find their remedies, eliminate the adverse effects, so that the project construction schedule as planned as far as possible ; When lapses occur, should be combined with the influence factors of the causes in order to achieve the progress of construction.Based on the wind farm construction project overview of the main problems and the progress of the project control and management of the content, principles and methods of interpretation, analysis of the impact of wind farm construction progress of the various factors that affect the Feng After comparing the electric field in order to find the process of building a major factor, according to the project management theory and practical experience of the various response methods and measures. Control objectives and clearly defined the importance of progress; given the progress of the organization of control measures, management measures, economic measures, technical measures and the progress of the control methods and procedures; made progress at all stages of project control is the whole process of control, requiring participants all staff to participate in the construction units, the progress of joint control.
Keywords/Search Tags:Wind Farm, Progress, Control, Discover
PDF Full Text Request
Related items