Font Size: a A A

The Research Of Optimization And Alternation To Wu Long Mine's Ventilation System

Posted on:2006-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:T G JiaFull Text:PDF
GTID:2121360182473418Subject:Safety Technology and Engineering
Abstract/Summary:PDF Full Text Request
For the research of optimization and alternation to the Wu Long mine's ventilation system network which is based on the bootstrap scheme, according to the actual need,this thesis mainly carries on the system general survey to Wu Long mine, founds Wu Long mine's ventilate the simulation system, diagonal structure stable analysis, spontaneous ventilation pressure to the mine pit influence analysis, the simulation draws up ventilates the plan and makes the optimization to ventilate the plan。 The scene obtains the good application effect.It has achieved the paper research goal. At the same time, it has enriched the mine ventilation management idea in the certain degree. It's specially fixes production quotas for the mine pit, production management for the high gas mine pit by the wind has reliably provided one kind reliably, convenient, the quick policy-making method. It provides the scientific basis for ventilated the plan the formulation.
Keywords/Search Tags:ventilate simulation, diagonal structure, industrial test, simulation, spontaneous ventilation pressure, ventilation network optimization
PDF Full Text Request
Related items