Font Size: a A A
Keyword [earned-value]
Result: 141 - 160 | Page: 8 of 10
141. Function Point Method-based Software Project Earned Value Analysis And Assessment Of Progress In Process Research
142. Foundation Construction Project Cost Control In Construction
143. The Target Cost Of The Bill Of Quantities Applied Research
144. A Study On The Earned Value Method In The Cost Management Of Government Investment And Construction Project
145. Research On Cost Control Of Municipal Engineering Construction Project In Industrial Park
146. Study On Cost Control Of Construction Project
147. Research On Project Cost Control For Network Reconstruction Of Ba Da Guan Hotel In Qingdao
148. On Cost Control Research Of The Third Section Of Xinjiang Guo-Huo Highway Project
149. The Project Cost Of Control Research On Civil Air-Defense Business Street Of A
150. The Study Of Cost Control About Oil-gas Exploration Project
151. The Application Of Earned Value Method In Electrical Construction Company
152. Study On Optimal Progress Management Of BSL-3 Project
153. Study Of Earned Value Management In Mobile Communications Network Investigation & Design Project
154. Earned Value Project Management Particularly In The Field Of Mobile Communications Engineering Construction Project Management
155. Research On Development Of Safeline X-Ray Inspection In Cost Control And Rosource Management
156. Research On The Whole Process Of Cost Control System Of ZB Phase â…¢ Project
157. The Application And Research On JM Unicom 3G09 Projects Of The Whole Process Cost Control System
158. The Research Of Cost Management Of Fiber Optic On The H-H Cable Project
159. Pastoral Community Development Project Of Weifang Rich Cost Control
160. Highway Construction Enterprise Dynamic Responsible Cost Evaluation System Research Based On The Activity-based Costing And Earned Value Measure In Our Country
  <<First  <Prev  Next>  Last>>  Jump to