Font Size: a A A
Keyword [Scheduling problem]
Result: 181 - 200 | Page: 10 of 10
181. Simulated Annealing Based On Ant Colony Algorithm For Solving The Grid Of Task Scheduling Problem
182. The Appling Research Of University Course Scheduling Problem Based On Genetic Algorithms
183. The Study Of The Distributed And Flexible Job-shop Scheduling Problem Based On Improved Geneticalgorithms
184. Online Course Scheduling System Implementation Based On Genetic Algorithm
185. Hybrid Robust Scheduling For Flow Shop Based On Fuzzy Theory
186. Improved Adaptive Genetic Algorithm In Job-Shop Scheduling Problem Research
187. Study On Job Shop Scheduling Problem Based On Genetic Algorithm
188. Design And Implementation Of An Algorithm On Solving The Flexible Job Shop Scheduling Problem
189. An Discrete Differential Evolution And Its Application Research In Flexible Job-shop Scheduling Problem
190. Scheduling Problem Research Of Re-entrant Manufacturing System Based On Petri Nets
191. Study Of Mixed-model Hybrid Shop Robust Scheduling Problem Based On Multi-Populations Parallel Genetic Algorithm
192. Multi-objective Flexible Job-Shop Scheduling Problem With The Adjustment Time
193. Research On Algorithm For Flexible Job-Shop Scheduling With Multi-objective
194. Research On Variable Neighborhood Search Algorithm In Personnel Scheduling Problem
195. Research Of Flow Shop Scheduling Problem Based On Improved Artificial Fish Swarm Algorithm
196. Research On Flow Shop Scheduling Problem Based On Improved CIA
197. Research Of The Supply Chain Production Scheduling Problem Based On The Character Of Short Life Cycle Products
198. Research On Job Shop Fuzzy Scheduling Problem Of Major Equipment Maintenance Companies
199. A Study Of The Multi-objective Flexible Shop Scheduling Problem And Development In Changfa Enterprise
200. Research Of Flow Shop Scheduling Problem Based On Hybrid Artificial Fish Swarm Algorithm
  <<First  <Prev  Next>  Last>>  Jump to