Font Size: a A A
Keyword [soft-soil]
Result: 81 - 100 | Page: 5 of 10
81. Study On Rheological Property Of Soft Soil And Its Apply On Engineering
82. Research On Design And Construction Of Group Wells And Equivalent Calculation Model Of Non-constantly Pumping Dewatering Well In Erhe Project
83. Research On Prediction Of Settlement In Soft Soil Foundation In Engineering Strengthened By Vacuum Combined Surcharge Preloading
84. Analysis On Mechanical Characteristics Of Pipelines Buried In Soft Soil Under Transportation Loads
85. Analysis Of Composite Soil Nailing With Limited Equilibrium Method
86. Creep And Concurrent Deformation Analysis Of Deep Excavations In Soft Clay
87. Study On The Behavior Of Micropile For Transmission Tower In Soft Soil
88. The Settlement Calculation And Designment Analysis Of Rigid-soften Composite Piles Foundation In Deep And Thick Soft Soil
89. Study On The Mechanism And Settlement Computation Method Of Prefabricated Drain Preloading
90. The Control And Effects Of Subgrade Deformation Of Single-layer Steel-frame Mill Building In Soft Soil Area
91. Study On Decreasing Water Level Of Confined Water In Soft Soil Two-layer Deep Excavation Through Interior Model Experiment
92. The Theory And Design Of In-Place Deep Mixing Method And Its Application To Soft Soil Improvement
93. Investigation Of Deformation Behavior In The Soft Soil Ground Under Explosive Loading
94. The Stability Study Of Soft Soil Foundation Under Multi-stage Preloading
95. Creep-Consolidation Characteristics Of Soft Soil And Finite Element Analysis Of Consolidation Of Soft Soil Foundation
96. The Surface Settlement Behind Retain Wall Estimate Research Of Soft Soil Foundation Pit
97. Study On The Performance Of Soft Soil Groung Improved By Vacuum-Heaped Load Combining Preloading Technique
98. Application And Research Of Prefabrication Drains In The Soft Soil Foundtation In Harbin
99. On Mechanism And Regulation Of Settlement Of Soft Soil Foundation In Zhu Jiang Delta Area
100. Study For The Control Of Stability And Settlement In Construction Of Soft Soil Road Bank Treated With Surcharge Preloading And Vertical Drainage Wells
  <<First  <Prev  Next>  Last>>  Jump to