Font Size: a A A
Keyword [post-construction]
Result: 61 - 80 | Page: 4 of 5
61. Analysis Of Foundation Deformation And Stability Of High Fill Of Airport In Mountainous Area
62. Analysis And Calculation Of Post-construction Settlement Of Pier Foundation Of High Speed Railway Bridge
63. Research On The Settlement Deformation Characteristics And Calculation Method Of High Ultra Wide Rock Fill Embankment
64. Study On Retreatment Method For High-fill Foundation Of Airports In Mountainous Regions
65. Research Of Prediction Method For Settlement On The Loess Region High-speed Railway
66. Effects Of High Embankment Of Weining Airport Under Different Filling Velocity
67. A Prediction Method For Post-construction Settlement Of Soft Subgrade Soil With The Consideration Of The New Or Old Degree Of Measured Data
68. Analysis Of Rock-filling's Embankment Settlement In Karst Tunnel And ImPact On Tunnel's Stress
69. Numerical Analysis Of Mechanical Characteristics For Sheet-pile Wall On Steep Slope Subgrade Of Ballastless Track In High-speed Railway
70. Study On Quality Control And Prediction Of Post-construction Settlement For Mountainous High Fill Airport
71. The Safety Study And Calculating Analysis For Large Preloading On Deep-thick Soft Soil Near River And Mountain
72. Study On Post-construction Settlement Deformation Laws And Prediction Of High Fill Embankment In Mountainous Areas
73. Study On Comprehensive Compaction Method Of Heavy Hammer Tamping For High Fill Embankment In Loss Filling
74. Study On Logistic-Hyperbola Combination Prediction Model For Post Construction Settlement Of Loess High Fill Embankment
75. Effects Of Construction-induced Disturbance On Post-construction Settlements Of Shield Tunnel And Ground In Soft Clavev Strata
76. Study On Post-construction Deformation And Size Effect Of Rockfill Using DEM
77. Study On Settlement Deformation Of Rheological Clay Foundation Under High Filled Subgrade
78. Forecasting Special Section Subgrade Settlement Of Mountainous Freeway By Single/Combined Method
79. The Application Of Manufacturing Execution System In Post-construction Of Shipyard
80. Study On Post Evaluation Of Lake Type National Wetland Park Construction
  <<First  <Prev  Next>  Last>>  Jump to