Font Size:
a
A
A
Keyword [pipe jacking]
Result: 181 - 200 | Page: 10 of 10
181.
Design Of Cutter Head Structure And Development Of CAD System For EPB Pipe Jacking Machine
182.
Research And Application Of Soil Reinforcement Method At The Originating End Of Pipe Jacking
183.
Structure Design And Optimization Of Cutter Head For Slurry Balance Pipe Jacking Machine
184.
Beeding Stiffness Model And Deformation Mschanism Of The F-type Socket Joint In Rectangular Pipe Jacking
185.
Research On Circumferential Mechanical Properties Of Large Diameter Reinforced Concrete Pipe Jacking
186.
Interaction Characteristics Of Pipe-Soil-Slurry And Calculation Model Study Of Friction Resistance For Slurry Pipe Jacking In Water-Rich Sandy Layer
187.
Study On Axial Mechanical Characteristics Of Reinforced Concrete Pipes During Longdistance Jacking In Soft Stratum
188.
Estimation Of Rectangular Jacking Pipe’s Jacking Force In Guangzhou Silty Stratum
189.
Research On Mechanical Characteristics And Key Technologies Of Trenchless Pull Top Tube Construction
190.
Study On Optimization Of Construction Scheme Of Three Hole Super Large Diameter Pipe Jacking
191.
Study On Stability And Environmental Impact Of Jacking Pipe
192.
Research On Deformation Law Of Upper Pipeline Caused By Rectangular Pipe Jacking Construction
193.
Study On The Influence Of Pipe Jacking On The Mechanical Characteristics Of Tunnel Structure In Sandy Soil Layer
194.
Numerical Analysis And Analytical Solution Research On Buckling Of Large Diameter Steel Pipe Jacking During Construction
195.
Research On Construction Disturbance Of Underground Space Connecting Passage Close To Ancient Building Structure
196.
Research On Settlement And Control Technology For Construction Of Adjacent Houses And Pipelines In Pipe Jacking Tunnels
197.
Research And Engineering Application Of Mechanical Properties Of Socketed Concrete Pipe Joints
198.
Research On The Influence Of Pipe Jacking Through Embankment On The Safety Of Embankment And The Countermeasures
199.
Research And Application Of Key Anti-seepage Parameters After Pipe Jacking Through Embankment
200.
Analysis Of Influence Of Rectangular Pipe Jacking Construction On Overlying Existing Roads And Pipelines In Cohesive Soil Layer
<<First
<Prev
Next>
Last>>
Jump to