Font Size: a A A
Keyword [existing subway]
Result: 41 - 60 | Page: 3 of 4
41. Study On Displacement Compensation Technology Of Grouting Settlement Passing In Existing Subway
42. Study On Key Construction Technology Of Deep Foundation Engineering For Crossing Existing Subway Station
43. Effects Of Existing Subway Tunnels Due To Adjacent Excavation Construction Of Foundation Pit
44. Study On The Influence Of Parallel And Deep Foundation Pits Excavation On Existing Subway Stations
45. Research Of Deformation Of Existing Subway Tunnel And Soil Induced By Excavation Engineering
46. Study On Impact And Control Technology Of Bored Tunnel Undercrossing The Existing Subway Station At Short Range
47. Study On Safety Risk Assessment And Control Of Deep Foundation Pit Construction Adjacent To Existing Subway
48. Research On Mechanism And Control Of Existing Subway Tunnel Deformation Induced By Multi-crossing Of Shield Tunnel Underneath
49. The Assessment Of The Influence Of Adiacent Constructions On The Safety Of Existing Subway Tunnel
50. The Deformation Effect Of Existing Subway Tunnel Adjacent To Foundation Pit Excavation
51. Study On The Influence And Control Measures Of Adjacent Pit Engineering On The Construction Of The Existing Subway In The Soft Soil Area
52. Study On Safety-Effect Of Existing Subway Station Under The Construction Of Shallow Excavation And Expansion
53. Study On Dynamic Interaction Of Newly-built Underground Structure Dynamic Loads To Existing Subway Shield Tunnels
54. Influence Of Rotary Excavated Pile Construction Of Airport Over Line Bridge On Existing Subway Tunnels
55. Analysis On The Impact Of Pile Foundation Construction Of A Viaduct On The Adjacent Existing Subway Tunnel
56. Research On The Influences Of Newly-built Subway Station And Tunnels The Stability Of Adjacent Existing Subway Station
57. Research On Construction Technology Of Shield Section Of Existing Subway Lines On Shallow Overlying Soil
58. Study On Stability Of New Subway Tunnels Underpassing Existing Lines
59. Study On Mechanical Response Of Construction Of Adjacent Power Tunnels Through Existing Stations
60. Impact Research Of Shallow Buried Rectangular Tunnel Under-crossing Existing Subway Bridge In Short Distance
  <<First  <Prev  Next>  Last>>  Jump to