Font Size: a A A
Keyword [drilling and blasting]
Result: 21 - 40 | Page: 2 of 3
21. Critical Vibration Velocity Of Surrounding Rock Damage Calculation Methed For The Study On Tunnel And Underground Engineering By Drilling And Blasting Construction
22. The Construction Method Of Qingdao Wujiang Subway Tunnel Under Buildings
23. Research On Construction Risk Management Of Metro Cross-Sea Tunnel Engineering Based On Drilling And Blasting Method
24. The Establishment Of Microseismic Monitoring System In Zijing Tunnel And The Preliminary Analysis Of Microseismic Characteristics Of Surrounding Rock
25. Research On Construction Safety Management Of Metro Station Engineering Based On Drilling And Blasting Method
26. Study On The Dynamic Responses Of Bridge Piers Under The Synergistic Effects Of Seismic Wave And Water Shock Wave Induced By The Underwater Drilling And Blasting
27. Analysis On Dynamic Response And Safety Assessment Of Existing Tunnel Under Blasting Load
28. Comparison And Selection Of Construction Methods For Excavation Of Long,Large And Deep Buried Tunnel
29. Flow Simulation And Optimization In Cartridge Dust Collector For Drilling And Blasting Tunnel
30. Evolution Mechanisms Of Rock Fragmentation Under Blasting And Optimum Design Of Drilling And Blasting In Deep Tunnel
31. Research And Application Of Smooth Blasting Technology In Xiong Chong Tunnel
32. Research On Key Technical Problems In Tunnels Construction Adjacent To Existing Buildings By Methods Of Drilling And Blasting
33. Study On Selection And Matching Of Tunnel Construction Machinery And Analysis Software Development
34. Research On Quality Control Of Trunk Excavation Of Highway Mountain Tunnel In Daba Mountain Area
35. Controlled Blasting Technology For Tunnel Enlargement By Drilling And Blasting Method In Urban Environment
36. Study On Comprehensive Rockburst Warning Based On Microseismic Monitoring In Micangshan Highway Tunnel
37. Application Research On Mechanized Drilling-blasting Method Construction Technology And Equipment Of Highway Tunnel In Weak Surrounding Rock
38. Study On The Infiuence Of Periphery Hole Blasting Parameters On Surrounding Rock Damage And Overbreak And Underbreak Of Tunnel
39. Study On Vibration Safety Influence Of Existing Tunnel Induced By Drilling And Blasting Of Underpass Tunnel
40. The Influence Of Underground Tunnel Excavation By Drilling And Blasting Method On Urban Buried Pipeline System
  <<First  <Prev  Next>  Last>>  Jump to