Font Size: a A A
Keyword [advance rate]
Result: 1 - 6 | Page: 1 of 1
1. Study Of Control Of Double Shield TBM Jamming By Numerical Simulation In Deep Squeezing Ground
2. Examination of excavation chamber pressure behavior on a 17.5 m diameter earth pressure balance tunnel boring machine
3. In-situ Data Modeling Methods Of Shield Machine And Their Application Research
4. Geological Recognition And Prediction Of TBM Advance Rate In Tunneling Construction Based On In-Situ Data
5. Classification Of Surrounding Rock And Intelligent Prediction Analysis Of Advance Rate Based On Real-time Monitoring Data Of Shield
6. Analysis And Prediction Of Group TBM Tunneling Performance
  <<First  <Prev  Next>  Last>>  Jump to