Font Size: a A A
Keyword [The loess area]
Result: 1 - 20 | Page: 1 of 2
1. The Settlement Monitoring And The Deformation Prediction On The Under Line Project Of The Loess Area High-speed Railroad
2. Experimental Research On Controlling Technology Of Settlement And Deformation For High-fill In The Loess Area
3. The Loess Area Shallow Buries And Digs Secretly The Third Company To Arch Subway Tunnel The Structure Stress System Transformation And The Characteristic Studies
4. High Embankment Of The Loess Area In Gansu Province, Deep Cutting Slope Stability Study
5. Deep Gullies Bridgehead, The Loess Area, Spray The Anchor Protection Applied Research
6. The Typical Structure Of The Loess Area In Gansu Asphalt Pavement Research
7. The Dark Hole In The Loess Area Under The Highway Roadbed On The Casing Layer Security Thickness Model Test
8. The Research Of Pavement Splicing Technology On The Expansion Of Highways In The Loess Area
9. Widen Embankment Settlement TraitsBig Than Feet Model Experiments Of The Loess Area Highway
10. Culture-oriented Research Of Residential Building Material And Construction Design Method In The Loess Area
11. The Research Of Completeness Of Pile In The Loess Area
12. The Research For Finite Earth Pressure And Its Influencing Factors In The Loess Area
13. Study On The Selection Of Reasonable Bridge Pile Foundation Length Based On Pile Group Effect In The Loess Area
14. Primary Support Tunnel Lining Structure Research The Loess Area
15. Retaining Structure Design Theory And Its Deformation Law Research Of The Loess Area Foundation Pit With SMW Method
16. Analysis Of Influence Of Metro Tunnel Construction On Adjacent Buildings In The Loess Area
17. Close In The Loess Area,Underground Passage Across Both The Key Techniques Of Building Construction
18. Monitoring Analysis And Numerical Simulation Of Deep Foundation Pit Pile-anchor Supporting Structure System In Loess Areas
19. Study On The Influence Of Isolation Membrane On The Negative Friction Resistance Of Loess Pile Foundation Under Pile Load Condition
20. Comparison And Selection Of Reconstruction And Expansion Schemes For In-service Tunnels In The Loess Area
  <<First  <Prev  Next>  Last>>  Jump to