Font Size: a A A
Keyword [Karst cave]
Result: 61 - 80 | Page: 4 of 6
61. Construction Mechanism And Control Technology For Shield Tunnelling Near The Interface Between Karst Caves And By Sandy Strata
62. The Application Of Grouting Technology In Subway Tunnel Of Poor Stratum
63. Research On Influence And Technology Of Hall Of Corridor Type Cave On The Structure Of Tunnel
64. Study On Seismic Response Characteristics And Shock Absorption Measures Of Tunnels Crossing Karst Area
65. Study On The Influence Of Elliptical Karst Cave On Tunnel Safety Under Blasting Load
66. Study On Structure Selection And Optimization Technology For Tunnel Crossing Large Karst Cave
67. Analysis On Stability Of Karst Tunnel Surrounding Rock At Construction Stage
68. Settlement Regularity And Control Technology Research Of Ultra Thick Backfill Subgrade In High Speed Railway Tunnel Under The Condition Of Giant Karst
69. Experimental Study On Seismic Stability Of Large Diameter Bridge Piles In Karst Area
70. Research On Microseismic Monitoring Of Rock Mass Collapse During Tunneling Through Karst Cave District
71. Study On Settlement Mechanism Of Backfill Subgrade Of Railway Tunnel Crossing Giant Cavity
72. Study On Deformation Law Of Surrounding Rock Of Shield Machine Passing Through Filling Cave
73. Analysis Of Influence Of Unfilled Karst Cave On Surrounding Rock Stability Of Tunnel
74. Three-dimensional Numerical Simulation Of Karst Cave In Tunnel Seismic Advanced Prediction
75. Stability Of Hydraulic Filled Bead Cave To Tunnel Impact Analysis
76. Study On The Influence Of Hidden Karst Caves On The Stability Of Heavy-haul Railway Tunnels
77. Simulated Analysis Of Stress And Displacement Of Surrounding Rock Of Separated Tunnel In Karst Area Based On FLAC 3D
78. The Collapse Mechanism Of Rock Mass Above A Highway Tunnel Induced By A Concealed Karst Cave In Karst Region
79. Study On The Construction Stability Of Filled Clay Karst Tunnel
80. The Research On The Influence Of Karst Cave In Front Of Pile On The Horizontal Bearing Characteristics Of Pile Embedded Segment
  <<First  <Prev  Next>  Last>>  Jump to