Font Size: a A A
Keyword [Construction parameters]
Result: 41 - 60 | Page: 3 of 3
41. Random Forest Method-Based Prediction And Control Of Bridge Pier Displacements During Construction Of Shield Tunnels In Close Proximity
42. Sensitivity Analysis For Construction Parameters And Finite Element Model Modification In Closure Jacking Stage Of Continuous Rigid Frame Bridge
43. Research On Construction Progress Analysis For Concrete Gravity Dam Under Uncertainties
44. Research On Construction Technology And Stratum Deformation Of Shield Tunneling Through The Main Canal Of South-to-North Water Transfer Project
45. Analysis Of Construction Parameters And Deformation Mechanism Of Metro Shield Tunnel Undergoing Rectangular Jacking Tunnel
46. Study On The Subsidence And Control Measures Of High Railway Base Over The Subway Shield Tunnel
47. Study On Geological Adaptability Of Construction Parameters Of Double-shield TBM Based On Shenzhen Metro Tunnel
48. Correlation Analysis Of Shield Construction Parameters Based On Big Data Technology
49. Study On Construction Impact Analysis And Control Technology Of Long-distance Continuous Shield Tunneling Through Buildings In Soft-plastic Ground
50. Experimental Study On The Interaction Mechanism Between TBM Disc Cutter And Rock
51. Analytical Algorithms For The Cable Configuration And Construction Parameters Of A Suspension Bridge
52. The Research On Error Characteristics And Control In Construction Parameters Control Of Long-span Suspended-cast Arch Bridge
53. Study On Construction Mechanical Characteristics And Optimization Of Construction Parameters Of Soft Rock And Variable Cross-section Tunnel
54. Grouting Reinforcement Mechanism And Engineering Application Of Existing Bridge Pile Foundation In Expressway Reconstruction And Extension
55. Earth Pressure Prediction Of Shied Tunnel Sealing Based On Mind Evolutionary Wavelet Neural Network
56. Research On Shield Construction Parameters,Personnel,Mterials And Machinery Management And Control Method Based On Intelligence Algorithms And BIM
57. Influence And Control Of Shield Tunneling Across Rivers And Bridges
58. Influence Of Shield Underpass Construction On Existing Railway In Deep Clay Stratum
59. Study On Construction Parameters Of Slab Replacement For CRTS Ⅱ Slab Track
60. Coupling Simulation Test Of Stone Compaction Process With Strength Difference Based On Discrete Element
  <<First  <Prev  Next>  Last>>  Jump to