Font Size: a A A
Keyword [COWA operator]
Result: 1 - 9 | Page: 1 of 1
1. The Research Of Quality Management Influence Factors Of The Whole Process Of HY Business Center Real Estate Project
2. Research On Risk Evaluation Of Engineering Project Interface Based On G-COWA
3. Research On Construction Quality Evaluation Of Prefabricated Concrete Buildings
4. Research On Communication Management Of EPC General Contracting Project
5. Study On Project Scope Management Maturity Under EPC Model
6. Research On Quality Evaluation Of Whole Process Engineering Consulting Service Based On Maturity Model
7. Fusion Decision Methods Based On Evidence Reasoning And Its Application In Fault Diagnosis
8. Research On The Quality Evaluation Of Judicial Appraisal Service For Engineering Cost
9. Construction Safety Risk Evaluation Of PL Steel Girder Cable-stayed Bridge With Walking Push Based On Two-dimensional Cloud Model
  <<First  <Prev  Next>  Last>>  Jump to