Font Size: a A A
Keyword [BIM contract]
Result: 1 - 3 | Page: 1 of 1
1. Research On Dynamic Cost Control Of Construction Project Based On BIM
2. Research On Design And Optimization Of BIM Contract Oriented To Project Management Process Reengineering
3. Relating Contract Specificity To Performance In BIM-enabled Projects
  <<First  <Prev  Next>  Last>>  Jump to