Font Size: a A A
Keyword [water-cut]
Result: 161 - 180 | Page: 9 of 10
161. Adjustment Measurements Of Water Flooding In Extra-high Water Cut Period In Sabei Development Area
162. Research On Multicycle Profile Controlling And Water Plugging In High Water Cut Blocks
163. Research On The Identification Of High-Capacity Channels In Ultra-High Water Cut Stage In Saber Development Area
164. Study Of The Structure Adjustment And Potential In Late Period Of High Water Cut In Lasaxing Oilfield
165. Study On Remaining Oil Distribution At High Water-cut Stage Of Kumkol Oilfield
166. Technology Of Subsequent Water Flooding Cyclic Studying In Naner Area Saertu Oil Field
167. The Research And Application On Profile Control Agent In High Water-content Petroleum Deposit Of Oil Field Mid-late Development Stage
168. The Water Cut And Flow Measurement Technology Research
169. Research On Water Flooding Fine-digging Technongy In The North Of Saertu Deyelopment Area Daqing Oilfield
170. Research On The Prediction Model Of The Fracturing Effect Based On Extra High Water Cut Stage In South Eighth Area
171. The Survey Of Gas And Liquid Distributary Flow Applied To Measuring Low Yield Liquid And High Water Content Tree-phase Flow
172. Research And Application Of Effective Technology For Water Injection In Qianan Area
173. Adjustment And Technology Research And Development In High Water-cut Stage Two Factory Of Daqing Oil Production
174. Study On The Determination Method Of Layered Water Injection Amount Of Extra High Water Cut Stage In Xingbei Development Area
175. Research On The Parameters Technique Of Layer-Recombination And Well Pattern-Adjustment For The Reservoirs With Ultra-High Water Cut Stage In SN Development Zone
176. Rational Water Injection Intensity In High Water Cut Stage Of East Of South8Region Block
177. Oil Displacement Experiments On Enhancing Recovery Of The Six Apricot Area With High Water Cut
178. Evaluation Of Remaining Oil Potentialities And Well Performance For Thick Layers’ High Water Cut Stage In Beierxi Developing Area
179. Partial Bridge Kawaguchi Oilfield Waterflood Technical Adjustments
180. Effective For Determining Oilfield Waterflooding Countermeasure Research To Increase Production
  <<First  <Prev  Next>  Last>>  Jump to