Font Size:
a
A
A
Keyword [unclassified tailings]
Result: 1 - 19 | Page: 1 of 1
1.
The Backfilling Mode And Technology Based On Industrial Ecology
2.
Research On Paste Parameter Of Unclassified Tailings-Granulated Blast Furnace Slag
3.
Research On The Key Technologies Of Mud Making And Tailing Releasing Of Vertical Sand Tank In Fankou Lead-Zinc Mine
4.
Study On Settlement Law Of Unclassified Tailings And Waste Rock Compound Filling Body In Huibaoling Iron Ore
5.
Tailings Filling Empty Area Of the Dehydration Test
6.
Study On Affections Of Pipeline Diameter To The Transportation Characteristics Of Backfilling Slurry Of Unclassified Tailings Inner Pipe
7.
Material Experiment Research And Process Design On Unclassified-tailings Paste Filling Of A Lead-zine Mine In Wenshan,Yunnan
8.
Unclassified-tailings Paste Preparation Control System Simulation Based On Single Neuron PID
9.
Study On Performance Of Cemented Backfill Materials With Unclassified Tailings And Stability Of Stope Surrounding Rock In Yongping Copper Mine
10.
Numerical Simulation And Application Research Of High Concentration Of Cemented Full Tailing Backfilling Pipeline Transportation
11.
Study On Size Change Of Unclassified Tailings Flocs And Its Thickening Performance
12.
Study On Rules Of Aggregate Structure Evolution And Mud Densification During Unclassified Tailings Thickening
13.
Research On The Rheological Characteristics And The Mechanism Of Shear Action During Paste Mixing
14.
Study On Physical And Mechanical Properies Of Unclassified Tailings Consolidation Under Freeze-thaw Cycles
15.
Study On The Rheological Properties And Pressure Loss Of Filling Slurry With Unclassified Tailings In Pipeline
16.
Research On The Rheological Properties And The Pipeline Resistance Characteristics Of Unclassified Tailings Cementitious Slurry
17.
Study On Shearing Evolution And Connected Mechanism Of Flocs Pore Structure In Thickened Tailings
18.
Internal Structure Evolution Mechanism Of Unclassified Tailings Mortar After The Floc Net Structure Strengthened By APAM
19.
Optimization Of Structural Parameters And Drift Layout Of Downward Layered Unclassified Tailings Paste Filling Stope
<<First
<Prev Next>
Last>>
Jump to