Font Size: a A A
Keyword [high water cut stage]
Result: 21 - 40 | Page: 2 of 8
21. Study Of The Unheating Chemical Dehydration Technology Of Huabei Oil Field
22. Research Of Sazhong Zone Development Technology Policy Limits In High Water Cut Stage
23. Evaluating Effect Of Flooding In High Water-cut Stage In Shanshan Oilfield
24. Study On The Complex Resistivity Model Of Water-Flooded Zone In Thick Oil Reservoirs During High Water Cut Stage
25. Study Of Water Flooding For Oilfield Development In High Water Cut Stage Of SZ Development Zone
26. The Study On Waterflooding Exploitation Feature And Adjustment Technology In Extra High Water-cut Stage
27. Variational Disciplinarian Of Development Index And Limit Of Technical Strategy For LSX Oil Field In Extra High Water Cut Stage
28. The Optimization Research Of Layer And Well Pattern Recombination Of Waterdrive Reservoir In Super High Water Cut Stage
29. The Optimization Of Well Pattern For The Complicated Fault-block Reservoirs At High Water Cut Stage
30. The Comparative Evaluation Of Well Infilling And Polymer Flooding In The High Water Cut Stage Reservoir
31. Research On Production Decline Theory And Model-building In High Water Cut Reservoirs
32. The Disciplinarian Research Of Water Driving In Sz Development Zone In The Period Of High Water Cut Stage
33. Development Effect Evaluation In The Stage Of Extra-high Water Cut For BD Block
34. The Theretical Research Of Water Driving In Sazhong Development Zone In The Period Of High Water Cut Stage
35. Research On The Identification Of Low-efficiency And Invalid Injected Water Circulation Belts In Ultra-high Water Cut Stage
36. The Disciplinarian Research Of Water Driving In SZ Development Zone In The Period Of High Water Cut Stage
37. Research On The Application Of Unheated Single Pipe Gathering Process During High Water Cut Stage Of Low-production Oilfields
38. Study On Comprehensive Managing Technology Of Hejian Complex Fault Block Reservoir In High Water Cut Stage
39. Study On Multistage Profile Control In Steam Stimulation At High Water Cut Stage
40. Research On Water Plugging And Sand Control Integration Technique For Water Flooding Reservoirs With High Water Cut
  <<First  <Prev  Next>  Last>>  Jump to