Font Size: a A A
Keyword [Bottom-water reservoir]
Result: 41 - 60 | Page: 3 of 6
41. The Bottom Water Reservoir Fracturing Water Control Mechanism And Optimization Of Process Parameters-in Bottom Water Reservoir As An Example Of WQ Exploration Area
42. Study Of Optimize The Parameter Of Bottom Water Of Horizontal Control Fluid Completion
43. Study On Water-flooding Exploitation Technology Policy Of Y6 And Y9 Reservoirs
44. Reservoir Engineering Studies Of Horizontal Wells For ZH Guantao Heterogeneous Reservoir With Bottom Water
45. Research On System Optimization And Interface Properties Of Gel Foam Plugging Agent In Thin-layered Bottom-water Reservoir
46. Invasion Simulation Experiments Study On The Edge And Bottom Water Reservoir
47. Study On The Production Capacity Of Horizontal Well Segment Completion In Bottom Water Reservoir With Different Completion
48. Study On Completion Technology Of Horizontal Well Tuning And Water Control
49. Study On Horizontal Well Mining Characteristics Of Bottom Water Reservoir In Luliang Oilfield
50. Study On Classification And Effect Evaluation Of Horizontal Wells In Luliang Oilfield
51. Study On Prediction Of Horizontal Well Production Capacity In Bottom Water Reservoir
52. Numerical Simulation Study On Increasing Oil And Increasing Effect Of ICD Completion In Horizontal Well
53. Study On Water Control Technology For Developing Strong Bottom Water Reservoir In Horizontal Wells
54. Study On The Law Of Seeing The Horizontal Well In The Bottom Water Reservoir And The ICD Water Control Method
55. Experimental Study On Nitrogen Foam Pressure Taper In High Temperature And High Salt Bottom Water Reservoir
56. Research On Completion Water Control Of Double - Horizontal Well In Bottom Water Reservoir
57. Study On Factors Affecting Oil Recovery Of Bottom Water Reservoir
58. Expanding Test And Application Of Heavy Oil Thermal Recovery In Sudan
59. The Calculation Method Research And Application Of The Bottom Water Reservoir Cone Shapein DaGang Yangsanmu Oilfield
60. Study On Segment And Screen Completion Of Horizontal Well In Bottom Water Reservoir
  <<First  <Prev  Next>  Last>>  Jump to