Font Size: a A A

Shen Hai Fu Xian Highway Machine-electrical Engineering Construction Project Quality Control Study

Posted on:2016-07-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y SunFull Text:PDF
GTID:2272330467998045Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of China’s economy, more and more travel way, highway,railway, aircraft, each kind of travel mode has its own unique advantages, among them,the most convenient and widely used is the road travel, therefore, more and morehighway because of economic development and construction of a large number ofneed and, after national highway, provincial highway, until more fast and convenienthighway, more and the driving speed is faster, more convenient travel, therefore, inthe context of the growing economy, the highway construction has become anindispensable foundation. Compared with the developed countries, our countryhighway construction although late, but has a high starting point, fast speed ofdevelopment, the highway mechanical and electrical reliability and safety of highwayconstruction has been greatly improved the early.In the process of highway construction, highway electromechanical engineeringis the foundation and an important part of composition, bear so highway use task,safety, convenience. Not only in the toll station, service area, water area and othersupporting parts need Highway Electromechanical Engineering, encountered in theconstruction process of tunnel excavation in mountainous areas in the process ofmechanical and electrical engineering, more is the key construction part. Local tollstations, service area and water area generally consists of power supply anddistribution, lighting, monitoring, charging system composition, the tunnel is due tomechanical and electrical engineering of expressway is the most complicated place,mainly composed of the tunnel power supply and distribution, lighting, ventilation,fire protection, monitoring system. In this paper, the quality control of double track to Shenhai expresswayelectromechanical engineering project as the research basis, through the highway tobuild distribution, lighting, ventilation, fire four systems for electrical engineeringprocess involves, conducts the research to the quality control of mechanical andelectrical engineering.The first chapter is the introduction part, introduces the basic situation of thepaper selected topic background and our country highway construction and thecommon problems. Combined with the project quality management theory and putforward the basic structure of the thesis main research method and the.The second chapter overview of Shenhai Expressway Electromechanical projectline and existing problems. After the introduction of the basic situation of double trackbased Shenhai Expressway Electromechanical project on the basis of quality problems,the related theory of project quality management proposed Shenhai ExpresswayElectromechanical project of double track in the implementation process, qualityconsciousness, including human quality control, quality planning, qualityimprovement of the deficiencies and problems.Analysis of the causes of quality problems in the third chapter ShenhaiExpressway Electromechanical project. This chapter uses the project qualitymanagement theory and related methods, the cause is analyzed from the aspects of theprocurement of raw materials, machinery and equipment, the main constructionmethod, the suitability of the project construction quality of personnel, other factorsetc.The fourth chapter Shenhai Expressway Electromechanical project line qualitycontrol countermeasures. This chapter is based on chapter analyze reasons for theproblems, from the project quality management system and the system construction,the main construction methods and quality control measures of improvement, thequality control of project personnel and quality training and other aspects of thecountermeasures.The last chapter is conclusion. Put forward the highway mechanical and electrical construction process, the general focus on the difficulties and thecorresponding construction method, and expounds the core factors of mechanical andelectrical construction project in highway of our country is the factor of "person", putsforward the process of highway construction, is the use of people of materials andpeople to people management process, therefore the human factor on the quality of theproject play a crucial role, to solve the key of our country highway constructionquality is the quality consciousness raising builders.
Keywords/Search Tags:Machine-electrical Engineering, QualityControl, Project Management
PDF Full Text Request
Related items