Font Size: a A A

The Research And Application On "Two Ratoi" Control Technique Of Pumping Unit Wells In Lamadian Oilfield

Posted on:2009-05-05Degree:MasterType:Thesis
Country:ChinaCandidate:J W DiaoFull Text:PDF
GTID:2121360248453700Subject:Oil and Natural Gas Engineering
Abstract/Summary:PDF Full Text Request
This paper points that since Lamadian oil field has entered higher water-cut stage in view of oil well operating comprehensive rework rate and the pump inspection of the high rate problems, through analyzing the main factors of oil well operating rework rate and the rate of pump inspection .The ageing , eccentric wear and other issues of pitman are the main reasons leading to high rate and the pump inspection since Lamadian oil field has entered higher water-cut stage. Our oil production plant in view of difficult problems , has carried out a series of scientific research , field extending test and affective management to form a suitable Lamadian oil field series of complementary technology ,so that rod pumped well"two rate"has been controlled . Effective approach of rod pumped well control"two rate"in higher water-cut stage has important guiding role for reducing the oil field cost of operation and improving rod pumped well management level.First of all, research online examination technology for discriminating oil tube. In view of this serious problem reality of break-off and leaking oil tube avoids this one that screw thread is defective to go down a second operation. Rotating leakage flaw detection technology has succeeded in the development oil tube screw thread detector.Secondly, the use of magnetic leakage method pipeline realized oil tube on-site detection. Oil tube screw thread taper detection technology research application and sentences the waste standard formulation. Through theoretical study, with oil tube at site actual determined oil tube examination detest-waste standard, has realized in the operation site to the oil tube damage situation qualitative analysis judgment. Standardize oil tube examination calibration method. Form waveform at site detection, and determine six kinds standard waveform take on the spot the actual measuring basis.Finally, studied against eccentric wear technology as well as against break-off technology, through the massive fundamental research and the field test, caused against eccentric wear measure to consummate continually, and has explored the prevention rod and tube eccentric wear effective action positively.
Keywords/Search Tags:higher water-cut stage, pump inspection rate, operating comprehensive rework rate, eccentric wear, break-off
PDF Full Text Request
Related items