Font Size: a A A

Study On Comprehensive Management Of Natural Mineral Water Project In Bh Group

Posted on:2018-05-22Degree:MasterType:Thesis
Country:ChinaCandidate:Y GuoFull Text:PDF
GTID:2321330518992850Subject:Project management
Abstract/Summary:PDF Full Text Request
Project management has gradually developed into a mature discipline, and applied to the social engineering. From the traditional aviation, military,architecture has gradually derived from the medical, manufacturing, software engineering and even government agencies, the project management has been gradually adopted by most enterprises, and play its own value. This paper combined with the theory of project management, for enterprises to provide scientific decision-making methods for the purpose of the comprehensive use of various theories of Beijing chemical industry group of natural mineral water project schedule, quality and cost management systematically and deeply.In this paper, the natural mineral water project of Beijing chemical industry group is taken as the research subject, and the method of literature reading and case analysis is used to study the 4S store project management of H company. Firstly, the research status at home and abroad to extract the corporate marketing strategy management, integrated management, project management, of enterprises in Beijing chemical industry group of natural mineral water project integrated management theory, the establishment of Beijing chemical industry group of natural mineral water project integration management the establishment of BH Group of natural mineral water project integrated management concept model of Beijing chemical industry group of natural mineral water project development Beijing chemical industry group,puts forward the existing natural mineral water project quality management,and a management and cost management problems; complete qualitative analysis of integration of Beijing chemical industry group mineral water project implementation stage three goals and on this basis, the integrated model of cost, schedule and quality; and the specific situation of Beijing chemical industry group of natural mineral water project case analysis,integrated model verification cost, schedule and quality are Effectiveness.Finally, from the three aspects of cost, schedule and quality, the paper puts forward the measures to ensure the comprehensive management efficiency of natural mineral water project of Beijing chemical industry group.
Keywords/Search Tags:integrated management, target management, natural mineral water project, earned value analysis
PDF Full Text Request
Related items