| University infrastructure project and other major or funded entirely by the government constructionof non-profit public welfare projects, prone to lose control of investment, construction period and it isdifficult to guarantee the quality, investment benefit is difficult to effectively, the problem such ascorruption problems emerge in an endless stream.University construction project because you theparticularity of the service object, the project management is project management and other socialdifferences, especially in the aspects of risk management for its construction cycle, sources of funding, theimpact of policy changes greatly, the process of constructing risk is difficult to grasp.So how to do agood job of agent construction management mode of college capital construction project risk managementhas become the important link of college capital construction management.The first chapter of the paper from the system’s concept, introduced acting organizational system thedevelopment at home and abroad, and introduced the domestic project management mode from theintroduction to the large scale popularization process.The second chapter mainly introduces the project of our country project implementing agentconstruction system management status and management mode, mainly for: engineering projectmanagement and general contracting projects two.On the generation system is on the basis of briefintroduction, starting from the basic construction characteristic and the particularity, the universityconstruction project implementing agent construction system management feasibility and necessity arediscussed.In the third chapter, from domestic and international risk management history and current situation,introduced the domestic and international risk management and status of the research on risk managementtheory of knowledge in the field of application of agent construction system.The fourth chapter introduces the research content and research framework.According to the researchcontent that study ideas and methods.The main research methods are the system analysis method, analytichierarchy process AHP, Delphi method, case analysis.The fifth chapter mainly discusses the mode of acting organizational system of project constructionrisk identification methods and principles.Discusses the construction management model of collegeconstruction projects risk policy risk, environment risk, management risk, economic risk, risk, and theestablishment of risk factors evaluation system. The sixth chapter mainly discusses how to use the AHP method, analytic hierarchy process AHP,Delphi method to the risk assessment, obtains the risk index comprehensive grade standard.The seventh chapter to Xi’an combined the second teaching building in University as an example, byusing the above risk assessment theory the project risk evaluation and the results of evaluation andpractical risk comparison, testing the reliability and practicability of the evaluation theory.Based on the project risk identification, risk factor analysis, risk evaluation model, risk index toestablish the system of evaluation index weight of assessment, risk, risk assessment and risk degree ofproject risk analysis for risk assessment, and other researchers theoretical knowledge, making its practicehas a strong practical, largely made up of traditional engineering project management deficiencies, reducethe project in the process of operation risk, for the successful implementation of the project laid thefoundation. |