Font Size: a A A

The Research On Loop Closing Operation In Distribution Network Of Beijing Urban Area

Posted on:2008-12-20Degree:MasterType:Thesis
Country:ChinaCandidate:J YuanFull Text:PDF
GTID:2132360212491815Subject:Power system and its automation
Abstract/Summary:PDF Full Text Request
Electric power worker usually must involve to gathers the link operation, carries on when the distribution network but actually shoulders the logical or circuit to overhaul. But when carries on gathers the link operates in the electrical network possibly to produce the bigger steady current as well as the surge current. This directly will affect the electrical network security stable movement. The article in gathered the link steady current and the surge current after the distribution network has carried on the detailed analysis, discovered the influence to gather the link electric current the factor, gathered the research and its in the correlation decision-making software development in the distribution network which the link operated has the very strong practical value.
Keywords/Search Tags:The distribution network gathers the link, Surge current, Tidal current adjustment
PDF Full Text Request
Related items