Font Size:
a
A
A
Keyword [Flow-shop scheduling]
Result: 121 - 124 | Page: 7 of 7
121.
Improvement Of Sparrow Search Algorithm Based On Rough Data-Deduction And Application Research
122.
Research And Implementation Of Balanced Optimization And Scheduling Of Mixed Production Lines In Medium Sized Enterprises
123.
Research On Production And Operation Process Optimization Of A Circuit Breaker Enterprise Oriented To Intelligent Manufacturing
124.
Research On NSGA-Ⅱ Improved Algorithm And Johnson_IG Algorithm For Solving Flow Shop Scheduling Under TOU
<<First
<Prev
Next>
Last>>
Jump to